Hollywood Hills ADU
A 532-square-foot garage-to-ADU conversion in the Hollywood Hills featuring a custom kitchenette, bathroom, new roof deck, exterior access, and coordinated hardscape and landscape improvements.
Project description
This residential construction project in Los Angeles included the partial demolition of an existing garage and construction of a new accessory dwelling unit (ADU) featuring a full kitchen, bathroom, and roof deck. The project also included a new parking trellis structure and a complete pool remodel, creating an independent living space and an upgraded outdoor area designed for everyday use and entertaining.
Existing Garage & Site Conditions
The existing garage and surrounding driveway conditions were documented to guide the planned ADU conversion and site improvements.
Demolition & Excavation
The existing garage interior and slab areas were removed, followed by excavation for the new structural and utility work.
Foundation Reinforcement
Reinforcing steel and underslab preparation were completed before placement of the new concrete floor system.
Concrete Slab Placement
The reinforced concrete slab was placed to create the new structural floor for the ADU conversion.
Structural Framing and MEP
With the ADU framing completed, the project advanced through the mechanical, electrical, and plumbing rough-in stage. HVAC components, electrical wiring, water lines, and drain systems were carefully installed and coordinated within the new structure in preparation for inspections, insulation, and drywall. This important phase established the essential systems needed for a safe, efficient, and fully functional living space.
Roof Structure & Enclosure
The ADU’s roof framing, structural beams, and exterior trellis assemblies created the primary structural framework, enclosing the new living space and supporting the roof deck above.
Drywall & Interior Build-Out
Drywall installation and finishing prepared the new living space for cabinetry, fixtures, and final interior finishes.
Bathroom Tile Installation
Bathroom wall tile was installed as part of the new ADU bathroom and finish package.
Custom Cabinetry & Interior Finishes
Custom wood cabinetry and built-in storage were installed as the interior progressed toward completion.
Roof Deck Completion
The completed roof deck, railing system, tile surface, and outdoor furnishings created an elevated living area above the new ADU.
Planning & Design
Project details
Project Details
- ADU Floor Area
- 532 sq ft
- Completion Year
- 2024
Conversion Details
- Conversion Type
- Garage-to-ADU Conversion
- Roof Deck
- New Roof Deck Above ADU
- Outdoor Improvements
- Hardscape, Landscape & Pool Integration
Video of the object
What We Did
ADU Conversion
- Drywall installation and finishing
- Custom kitchenette cabinetry
- Bathroom tile and fixture installation
- Interior lighting and finish work
Interior Build-Out
- Drywall installation and finishing
- Custom kitchenette cabinetry
- Bathroom tile and fixture installation
- Interior lighting and finish work
Roof Deck & Site Improvements
- New roof deck construction
- Metal railing installation
- Exterior stair access
- Hardscape and landscape improvements
Project Management
- Scheduling
- Trade coordination
- Material coordination
- Quality control
Work that speaks for itself
Reviews
We’re proud to have helped homeowners bring their construction and remodeling projects to life.
Read TestimonialsBuilt for the way you want to live
From a focused interior renovation to a transformative whole-home remodel, every project receives rigorous planning, field coordination, and quality control.